Product Categories

Contact Us

Add:North ring Road, Shenze County,Shijiazhuang City,Hebei Province ,China

Tel:+86-311-87513878

Phone:+8613933870601

Fax:+86-311-83525449

E-mail: nonghahajenny@nonghaha.net.cn

Web:www.nhhmachinery.com

News

Home > News > Content
Subsoiler In The Partial Traction State
Aug 09, 2017

Subsoiler In the partial traction state

The structural characteristics of high efficiency deep plowing plow

    (1) in the traditional plow on the basis of the plow and plow, you can deepen the farming layer (under the same traction, can be deepened 9 ~ 12cm).

    (2) The new plow is properly positioned on the tractor and the main tie rod is properly left in the plow mounting position, so that the unbalanced moment is shared by the tractor and the plow.

    (3) In the partial traction state, widen the plow side plate to improve the traction performance, the side plate through a special process, with the plow resistance center automatically positioning, automatic concentric, reducing the plow side pressure and supporting force, The work efficiency, reducing the resistance of the plow.

    (4) plow has a greater improvement. It is now a two-blade cutting edge of the blade cutting the wall of the soil, the right edge of the blade in the next level cut out the bottom, was cut off the soil mattress along the plow surface rose to the plow wall, borrow the two radial force of the blade to the soil Flip and broken, so traction resistance is only 50% of the traditional plow.

    (5) the new plow surface of the broken soil angle hanging 180 °, broken soil resistance is zero. Thus reducing the working resistance of the plow surface.

    (6) the instantaneous point of the plow suspension axis expansion and hanging rod in the ball hole in close cooperation to ensure that the plow of the straight line, reducing the resistance of the plow.

    (7) The center of the new plow is close to the left instantaneous point, which effectively solves the lateral pressure of the plow's center of gravity and reduces the resistance of the plow.

The Structural Characteristics of New Deep - plowing

    (1) The new deep plowed plowed plow and plow on the basis of the traditional plow, which can deepen the tillage layer.

    (2) The trailing position on the tractor is properly right and the main tie rod is properly left in the plow mounting position so that the unbalanced moment is shared by the tractor and the plow.

    (3) In the partial traction state, widen the plow side plate to improve the traction performance, the side plate through a special process, with the plow resistance center automatically positioning, automatic concentric, reducing the plow side pressure and supporting force, The work efficiency, reducing the resistance of the plow.

    (4) the new deep plow has a greater improvement. It is now a two-blade cutting edge of the blade cutting the wall of the soil, the right edge of the blade in the next level cut out the bottom, was cut off the soil mattress along the plow surface rose to the plow wall, borrow the two radial force of the blade to the soil Flip and broken, so traction resistance is only 50% of the traditional plow.

    (5) The surface of the new deep plowed crater is suspended by 180 ° and the resistance of the broken soil is zero. Thus reducing the working resistance of the plow surface.

    (6) The expansion of the instantaneous point of the new deep plow is closely matched with the ball hole in the hanger bar to ensure the straight walking of the plow and the resistance of the plow.

    (7) The depth of the new deep plowing wheel coincides with the left instantaneous point, which effectively solves the lateral pressure of the plow center of gravity and reduces the resistance of the plow.